Our past traffic projects

We’ve helped improve traffic flow and safety for major projects across the state

Since our inception, Smooth Flow Traffic Management has had the privilege of collaborating with some of South Australia's most prominent organisations, undertaking numerous traffic management projects in both urban and remote areas of the region.


These projects have allowed us to showcase our expertise and dedication in efficiently handling the complex logistics of traffic management, planning, and control solutions, ensuring the safety of both the local communities and the workforce involved.

Read more

Our clients:

BHP
Fulton Hogan
SA DIT
SA F&ESC
Ballestrin
Downer
Ahrens
Lucas TCS

Our works


Energy Connect Transmission Line Project

Client:
Project:
Work involved:
Project overview:

Downer

Construction of a new interconnector power line project which starts in Robertstown South Australia and stretches across the state 900km finishing in Wagga Wagga New South Wales

The team used their skills in traffic control to stop and go traffic while the works were carried out. The power lines stretched over many intersections and our team was there to stop the traffic while the lines were pulled through by helicopter. While the works are ongoing out traffic team have finished with their assistance to this project.

  • Traffic management
  • Roadworks
  • Speed restrictions

New mining camp in Roxby Downs

Client:
Project:
Work involved:
Project overview:

Ahrens

Building a new temporary camp in Roxby Downs, South Australia

Our team worked closely alongside Ahrens in construction of the new BHP mining camp, this included mobilisation of over 500 crib rooms, being oversize the crib room were escorted into the camp by out traffic team using a pilot vehicle. Our team was involved in all aspects of this project from traffic management to trade assistance work. Our team used their skill in traffic management to set up a contraflow while works where being undertaken on the roads, this kept all vehicles moving in and out of the mine without too much delay.

Building a new temporary camp for a mine shutdown, which included: 

  • Buildings
  • Crib rooms
  • Power lines
  • Water lines
  • Access roads

Other past projects


RAT collection points in Glossop, Murray Bridge, Mount Gambier, & Naracoorte
Client:

SAFECOM

Bridge inspections in Flinders Ranges
Client:

Symbiosis Australia

Power pole relocations in Berri 
Client:

Electel Resources

Regional bridge deck repairs
Client:

Ballestrin

RAT collection points in Glossop, Murray Bridge, Mount Gambier, & Naracoorte

Client:

SAFECOM

Bridge inspections in Flinders Ranges

Client:

Symbiosis Australia

Power pole relocations in Berri 

Client:

Electel Resources

Regional bridge deck repairs

Client:

Ballestrin

Contact us now


If you’ve got a question about our past project works or the range of traffic management services provided by Smooth Flow Traffic Management, get in touch now by giving us a call or by filling out our enquiry form with the details of your job. We’ll be happy to help as soon as we can with your total traffic control and planning needs.

Call now


Visit us

26B Kay Ave, Berri SA 5343, Australia

Contact Us

Share by: